Cladding render brickwork

Cladding Batten Installation Defects

2 examples in 2 videos 2 major

What it is

Cavity battens supporting timber cladding exceed the maximum 450 mm spacing requirement, terminating around 600 mm apart. Furthermore, drainage packers between battens and wall wrap are missing, preventing vital cavity airflow and moisture dissipation.

Battens supporting the James Hardie Axon cladding were fixed horizontally rather than vertically. This obstructs the vertical cavity airflow required to vent the wall system and breaches manufacturer specifications.

Standards

Explained in our own words. Check the current edition; which edition applies depends on the building permit date.