What it is

Brick perpends deviate out of plumb by more than 20 mm, exceeding allowable tolerances. In addition, mortar clearances between bricks drop below 2 mm against the mandatory 5 mm minimum.

A spirit level test demonstrates that the external brick wall is markedly out of plumb. The tilt exceeds accepted construction tolerances.

The brick wall is out of plumb by up to 16 mm, substantially exceeding the 5 mm allowable limit. Defective past rectification attempts left significant gaps along straight edges.

Standards

Explained in our own words. Check the current edition; which edition applies depends on the building permit date.