Defective painting and prep work
What it is
Skirting boards were painted after flooring installation, leaving paint splatters across timber floorboards. The builder refused to rectify the damage.
The painter failed to complete proper clean-up and left adhesive tape residues behind on surfaces.
The exterior painting is visibly defective and unfinished across sections of the building. Handover inspection was commenced while painting works were incomplete and substandard.
Standards
- AS/NZS 2311 Suggested reference, unverified
Explained in our own words. Check the current edition; which edition applies depends on the building permit date.
Video examples
- This Is How Families Lose Everything When Building A Home 8:26 cosmeticPaint overspray on floorboards from skirting painting
- 1.5 MILLION FOR THIS! 2:13 cosmeticSubstandard painting preparation and tape removal
- How Did Council Approve THIS? Total Building Fail Exposed! 7:59 cosmeticIncomplete and defective paintwork