Girder truss connection and bracing defects
What it is
Nails connecting the girder truss and truncated truss have separated due to roof movement under heavy tile loads. This shifting has pulled the bracing loose from its fixings and caused tears in the adjacent roof sarking.
The girder truss was installed without the specified 10 mm steel connection plate or M12 tie-down bolts to the steel PFC beam. The assembly is merely resting loose without structural tie-down.
Standards
- AS 1684.2 Suggested reference, unverified
- AS 4100 Suggested reference, unverified
- AS 4440 Suggested reference, unverified
Explained in our own words. Check the current edition; which edition applies depends on the building permit date.
Also relevant to
Video examples
- I Inspected Australia's Best House… 8 Years Later 26:51 majorDisplaced girder truss connections and detached structural bracing
- This First-Time Homebuyer’s Nightmare Will Shock You! 25:07 majorMissing structural connection plate and fixing bolts on RB2 girder truss