Posi-strut joist damage, modification, and support defects
What it is
Floor posi-struts have suffered physical damage and crushing during installation. Gaps of roughly 30 mm exist under structural supports, causing noticeable structural movement across the floor frame.
Posi-strut joist FT34 was installed off-location onto an ad-hoc builder-constructed nib wall instead of the engineered frame layout. The joist also features an unauthorized cantilevered overhang.
The end of a manufactured posi-strut joist was cut, field-modified, and heavily nailed with dozens of fixings. This unauthorised alteration split the timber chord and compromised the joist's engineered structural capacity.
Standards
- AS 1684.2 Suggested reference, unverified
- AS 4100 Suggested reference, unverified
- AS/NZS 4600 Suggested reference, unverified
Explained in our own words. Check the current edition; which edition applies depends on the building permit date.
Video examples
- I Hired Security to Do an Inspection: The Shocking Discovery the Builder Wanted Hidden! 12:00 majorDamaged posi-strut floor joists and excessive support gaps
- I Hired Security to Do an Inspection: The Shocking Discovery the Builder Wanted Hidden! 30:03 majorMisplaced posi-strut joist supported on unengineered nib wall
- I Hired Security to Do an Inspection: The Shocking Discovery the Builder Wanted Hidden! 30:38 majorSite-modified posi-strut end connection and split timber
- I Hired Security to Do an Inspection: The Shocking Discovery the Builder Wanted Hidden! 32:57 majorInadequate bearing and separation at posi-strut top chord support
- I Uncovered a Nightmare: Inside the ~$2 Million Townhouses of West Melbourne 33:23 majorModified open-web joist missing diagonal web member
- These Units That Shouldn’t Have Been Signed Off.. 22:22 majorSeverely notched posi-strut floor truss and omitted wall bracing