What it is

A structural timber roof truss is out of plumb by 57 mm across a 1,857 mm height, far exceeding the 37 mm allowable code limit. This excessive bow severely weakens truss compression capacity beneath tiled roof dead loads.

A roof truss was measured at 81 mm out of plumb, far exceeding the calculated maximum allowable tolerance of 17.4 mm. Adjacent roof support rafters were also improperly laminated with loose, unsecured timber offcuts.

A roof truss was installed out of position and built up by scabbing timber packing along its side to match the roof batten line. Modifying and splicing prefabricated trusses on site without engineering computations compromises structural roof geometry and capacity.

Standards

Explained in our own words. Check the current edition; which edition applies depends on the building permit date.