Separating framing joints and improper framing fixings
What it is
Framing joints exhibit multiple rows of overdriven nails yet are sagging and pulling apart. The compromised joints lack required load capacity despite signing off by the building surveyor.
Pryda hitch tie-down brackets allow roof trusses to deflect vertically without loading internal non-loadbearing walls. The builder nailed the brackets through the bottom of the slots rather than the required midway position, preventing movement.
Cladding nails completely missed the underlying timber studs and were too short to achieve required embedment. The structural framing remains visible through open exterior joints.
Standards
- AS 1684.2 Suggested reference, unverified
Explained in our own words. Check the current edition; which edition applies depends on the building permit date.
Also relevant to
Video examples
- I Exposed Preston’s Worst Build: Police Called During Shocking Home Inspection! 1:15:00 majorOver-nailed and separating framing joints with sagging members
- I Hired Security to Do an Inspection: The Shocking Discovery the Builder Wanted Hidden! 49:27 minorIncorrectly nailed Pryda hitch brackets on roof trusses
- Unveiling Worst Builder of 2024 55:52 majorMissed and undersized nail fixings into framing