What it is
The waterproofing membrane fails to terminate at the required height, leaving wall plasterboard paper exposed. Water entering behind the membrane risks tracking downstairs and causing substrate damage.
The vertical waterproofing upturn at the enclosed shower threshold measures only 5 mm rather than the required 15 mm above finished tile level. The non-compliant installation risks water bypassing the threshold and necessitates complete shower demolition.
The shower threshold in the main bathroom only achieves approximately 5 mm of vertical membrane upstand above the finished tile line, well under the prescribed 15 mm requirement. This failure enables sub-tile moisture penetration into surrounding rooms.
Standards
- AS 3740 Said in videoSuggested reference, unverified
Explained in our own words. Check the current edition; which edition applies depends on the building permit date.
Also relevant to
Video examples
- I Caught This Waterproofing Contractor On Bodycam… 0:49 majorIncomplete waterproofing membrane height exposing plasterboard
- What Does $335K Build in Bendigo? Shocking Findings! 16:21 majorDeficient vertical membrane termination in ensuite shower
- What Does $335K Build in Bendigo? Shocking Findings! 19:27 majorDeficient vertical membrane termination in common bathroom shower
- Unveiling Worst Builder of 2024 1:05:27 majorInsufficient waterproofing upturn, missing bond breaker, and dried membrane
- Cranbourne West Exposé: Revisiting the Construction Catastrophe 10:53 majorIncomplete perimeter waterproofing flashing termination in ensuite
- Unveiling WA’s Homes: Are These Australia’s Best Builds? 11:08 majorMissing waterproofing membrane termination at ensuite doorway
- I Inspected An Award-Winning Build | NSW Exclusive 25:41 majorAbsence of vertical membrane termination under sliding door screed