Facade alignment deviation from plans
What it is
The installed window hoods are unbranded offcuts rather than the specified Habitech brand required by the drawings. This incorrect installation does not match architectural plans and contributes to water ingress around window openings.
The front facade pillar is offset with an uneven gap of roughly 30 mm instead of aligning flush with the upper wall as specified on the architectural drawings. The opposing sides also fail to mirror each other symmetrically.
Standards
- NCC Vol 2 Suggested reference, unverified
Explained in our own words. Check the current edition; which edition applies depends on the building permit date.
Also relevant to
Video examples
- Post Inspection | Unbelievable $200,000 Rectification… 6:15 majorNon-compliant window shrouds not installed per plan
- The Ghost Builder & the Haunted Home: Unmasking Construction Nightmares 3:05 minorFront facade pillar alignment deviation from approved plans