Drainage System Blocked or Fouled by Debris
What it is
A stormwater drainage pit contains accumulated building spoil and unsealed pipe penetrations around the pit walls. Stormwater infrastructure must be completely cleared of debris and penetrations sealed watertight prior to commissioning.
Internal and external drainage outlets and pipes are clogged with discarded construction debris. Leaving trade waste inside drain lines violates plumbing standards and causes water blockages.
Standards
- AS/NZS 3500 Said in video
- AS/NZS 3500.2 Suggested reference, unverified
- AS/NZS 3500.3 Suggested reference, unverified
Explained in our own words. Check the current edition; which edition applies depends on the building permit date.
Also relevant to
Video examples
- Paid in Full, Yet Scammed? Unearthing a $1M NSW Building Nightmare! 32:58 minorStormwater pit fouled with debris and unsealed pipe penetrations
- Is The NSW Construction Industry A Shemozzle? 12:27 minorBuilding debris clogging drainage system