Excavation and Sewer Clearance Footing Undermining
What it is
The double skin brick wall and footing were constructed directly over an existing sewer branch instead of angled per engineering drawings. Water authority regulations prohibit placing additional loads or constructing ramps over sewer branches.
Excavation work has occurred within the zone of influence of an existing footing, leaving the brick wall footing undermined and exposed. Step cracking is evident in the brickwork, showing early subsidence and creating a structural collapse risk.
Standards
Explained in our own words. Check the current edition; which edition applies depends on the building permit date.
Also relevant to
Cladding render brickworkPlumbingSite works landscaping
Video examples
- I inspected a $500K Dangerous Extension 1:48 majorFooting and wall built over sewer branch contrary to authority requirements
- These Units That Shouldn’t Have Been Signed Off.. 3:00 majorExcavation in zone of influence undermining brick wall footing