Structural framing

Cut or penetrated floor joists and trusses

3 examples in 3 videos 3 major

What it is

Two structural floor trusses were cut to run unstrapped bathroom and toilet pipework. Severing the structural timber compromised the floor system and caused visible sagging and floor level drop.

Floor joists within the building structure have been cut, compromising the structural framing integrity.

An engineered timber I-beam has been roughly penetrated and cut through its structural section, potentially compromising its load-bearing capacity without engineering approval.

Standards

Explained in our own words. Check the current edition; which edition applies depends on the building permit date.