Defective, loose, or missing fasteners in joist hangers

3 examples in 3 videos 3 major

What it is

Joist hangers supporting the floor frame have been secured with non-structural cement sheet nails rather than structural connector nails. Several fastener holes have also been left completely empty.

Joist hanger brackets supporting floor framing members are missing most required fastener fixings, with only a single nail installed in place of the mandatory cluster. Several nails are protruding unfastened.

Multiple structural floor joist metal hangers are unsecured, distorted, or lack specified nail fixings into the supporting framing members.

Standards

Explained in our own words. Check the current edition; which edition applies depends on the building permit date.