Omitted or inadequate structural connections and fixings
What it is
The specified BR1 double floor bearer was replaced by an undersized joist. Furthermore, the required 8 mm steel connection plate with continuous fillet weld and M12 bolts was omitted, with the builder using coach screws into stirrups instead.
The engineering plans require two 240x45 LVL members connected via a 200 mm steel plate with three M16 bolts. Instead, the builder installed a single 140x45 timber member connected merely with coach screws.
Transfer beams were loosely placed over supporting steel columns without required structural bolting. Furthermore, a steel column detailed to land on a structural lintel rests directly on unreinforced brickwork.
Standards
No standards referenced.
Also relevant to
Cladding render brickworkFootings slabStairs balustrades decks
Video examples
- Unveiling Worst Builder of 2023 30:13 majorSpecified floor bearer and engineered steel column connections omitted
- Unveiling Worst Builder of 2023 37:17 majorBalcony beam undersized and bolted connection omitted
- I inspected a $500K Dangerous Extension 17:42 majorOmitted bolted beam connections and missing lintel support for steel column