Subfloor bearer support and span defects
What it is
Timber bearers consisting of single 240x45 mm MGP10 members span 4.16 m supporting floor loads, exceeding the 3.7 m span limit. The members are also required to be doubled according to residential timber framing span tables.
Subfloor floor joists are inadequately supported on a small beam skew-nailed into loose timber packer blocks, while early mould growth is already visible across timber members.
A primary bearer supporting roof, floor, and wall loads has sagged excessively, exhibiting deflections of more than 50 mm. The member is structurally overloaded and failing under design load combinations.
Standards
- AS 1684 Said in video
- AS 1684.2 Said in videoSuggested reference, unverified
- Table 49 Reference not matched
Explained in our own words. Check the current edition; which edition applies depends on the building permit date.
Also relevant to
Footings slabStairs balustrades decks
Video examples
- I Inspected A Dangerous Build | Illegal Build Caught 19:43 majorUndersized and single timber bearers exceeding maximum span limits
- I Uncovered a $1.1M NSW Building Catastrophe 25:35 majorInadequate subfloor bearer support and fungal growth on joists
- They Approved THIS?! Engineer Caught in Major Mistake! 14:11 majorOverstressed and severely deflecting timber bearer
- I Unraveled a $750K Construction Disaster: NSW Build Exposed! 10:59 majorSubfloor bearer missing designated support pier per engineering design