Inspection Library

Waterproofing wet areas

Balcony Membrane Application, Junctions & Terminations

3 examples in 3 videos 3 major

What it is

The balcony membrane lacks the required transition detailing at the internal junction. In addition, visible tearing is present in the installed waterproofing membrane.

The balcony waterproofing system displays failure of adhesion around the bond breaker because an improper primer was applied over silicone sealant. The membrane is lifting and peeling off at the substrate junction.

The external sliding door sill provides only about 15 mm of clearance above the balcony floor rather than the required minimum 40 mm upstand. This insufficient clearance prevents the proper termination of the waterproof membrane beneath the threshold.

Standards

Explained in our own words. Check the current edition; which edition applies depends on the building permit date.

Also relevant to

Finishes painting tilingWindows doors

Video examples