Balcony substrate preparation and detailing defects
What it is
Polyurethane waterproofing was applied directly across site dirt and construction debris on the balcony without cleaning or priming the substrate. This prevents adequate membrane adhesion and severely compromises long-term waterproofing integrity.
The membrane installation lacks required 15x15 mm transition fillets and uses unsuitable cloth tape rather than approved bond-breaker bandages. The resulting junctions exhibit severe bridge cracking and splitting across multiple sections.
The balcony perimeter flashing lacks compliant pressure seal detailing. Defective terminations and installation details compromise weatherproofing across the junction.
Standards
- AS 4654.2 Suggested reference, unverified
- AS/NZS 1170.1 Suggested reference, unverified
- NCC Said in video
Explained in our own words. Check the current edition; which edition applies depends on the building permit date.
Also relevant to
Video examples
- $7 Million Build Nightmare | Engineering Plan Error… 7:02 majorBalcony membrane applied over unprepared substrate and debris
- $7 Million Build Nightmare | Engineering Plan Error… 7:33 majorDefective balcony membrane detailing, missing fillets, and substrate cracking
- $650,000 for THIS!! #construction #siteinspections #tiktokinspector #leaks #realestate 0:58 majorNon-compliant pressure flashing on balcony
- Unveiling Worst Builder of 2023 50:15 majorBalcony membrane non-UV rated and balustrade fixing inadequate