Missing doors or windows / Incomplete installation at stage
What it is
The builder is claiming completion of the lockup stage despite windows and doors not being installed. A dwelling cannot reach lockup without external windows and doors secured.
Sliding door units lack glass panes despite fixing stage claims. Kitchen cabinetry is left incomplete and bowed rather than properly fitted.
Window assemblies were left incomplete and not properly fitted into openings. Substandard external plumbing pipework connections were also observed nearby.
Standards
- AS 1288 Suggested reference, unverified
- AS 2047 Suggested reference, unverified
- Domestic Building Contracts Act 1995 (Vic) s 3 Suggested reference, unverified
Explained in our own words. Check the current edition; which edition applies depends on the building permit date.
Also relevant to
Finishes painting tilingPlumbing
Video examples
- #construction #inspection #home #renovation 0:27 majorWindows and doors missing at lockup stage claim
- Rogue Builder Exposed: Illegal Construction Nightmare! 5:10 minorMissing sliding door glazing and incomplete kitchen cabinetry
- This Is What a Homeowner Got After Paying Hundreds of Thousands 6:12 majorUnfinished window installations and substandard plumbing
- Dubai's Luxury Resorts: The Shocking Truth You Need to Know 3:27 minorOmitted door frames and defective sealant application